Quality checks Enterprise plan

Quality checks that hold stock until it passes

Inspect what you receive, what you produce and what you dispatch against your own inspection plans. Stock waits under QC until it is accepted, rejected goods never reach the shelf, and the quality certificate goes out with the invoice.

What you get

Every part works on the same entries as your accounts, GST and TDS — record once, see it everywhere.

Inspection plans

Parameters per item with method, unit, minimum, maximum and target, pass / fail or measured, and sample size.

QC on goods receipt

An inspection lot opens on the goods received note and the stock stays under QC until it is decided.

Production and dispatch

Lots on production output and before dispatch, with dispatch blocked until the lot passes.

Results and decisions

Readings per parameter and sample, then accept or reject — rejected quantity is kept out of usable stock.

Graded goods

For goods bought on grade, such as coal or grain, price rules work out the rate deduction when the grade falls short.

Quality certificates

A certificate of analysis printed with the sales invoice.

Supplier quality

Inspection results feed the supplier’s quality score in the vendor rating.

How it works

Up and running in three steps.

Write inspection plans

Switch on Quality checks and set the parameters to test for each item.

Inspect

Lots open on receipt, production or dispatch; record the readings.

Decide

Accept or reject — stock is released or held, and certificates print with the invoice.

Frequently asked questions

When is an inspection lot created?

On a goods received note, on production output and before dispatch, for items that have an inspection plan.

What happens to stock under inspection?

It is held under QC and cannot be used or sold until the lot is accepted. Rejected quantity stays out of available stock.

Can I claim a rate deduction for below-grade material?

Yes. For graded goods the plan’s price rules work out the deduction on the accepted quantity, and KhataWise prepares the request for the supplier’s credit note.

Can I give customers a quality certificate?

Yes. The certificate of analysis for the lot prints with the sales invoice.

Try KhataWise on your own books

Accounting, GST and TDS are on our regular plans. The ERP modules on this page come with our Enterprise plan, priced separately and quoted for your business — talk to us for a quote.